During recent inspections, the Waterway Engineering team have identified a number of small problems that require immediate repair to the Farmers Bridge Lock Flight. These repairs are being carried out between 16th and 27th January 2012. The canal will be open from 1700 on Friday 20th until 0700 on Monday 23rd for anyone wishing to pass through this location.
. |