Between Tuesday 4th October and Friday 4th November 2011 on the Birmingham, Old Main Line, Canal a scaffold walkway will be erected. This is to enable emergency gas repairs to be carried out at two locations south east of the bridge. During these works the width of navigation will be reduced by approximately 2 meters.
. |