Between Monday 9th January 2012 and Friday 13th January 2012 a timber fender is to be installed along the coping stones on the northern wall at the end of the basin in the winding hole. A floating platform is to be utilised to facilitate these works. Boat owners are asked to be aware of the location of this platform when turning, to minimise the risk of collision.
. |