With effect from 13th June and 29th July 2011 a series of repair and erosion control works will be undertaken. The work will take place between Junction Lock 47 and Bridge number 20a on the River Soar. The lock will remain open during the works but passage will be reduced to one broad boat width. During these works you will be guided through the locks. Care should be taken when approaching and leaving the upstream end of the lock. . |