From 16th Jan to 20th Jan 2012 unexpected repair works are required to this bridge which is on the Llangollen Canal. The bridge being closed intermittently between these dates and journeys may be delayed for short periods. Please approach Wrenbury Lift Bridge with caution, and wait for instructions from the contractor to pass through the area.
. |