On 5th Dec 2011 AMEY construction is carrying out an underwater inspection of Keadby Canal Drawbridge and 40m to either side of the bridge. Between the hours of 0830 and 1630 divers will be in the water so be prepared to stop, if requested, whilst the divers vacate the water, there may be a short delay of 20 minutes
. |